Robotic Layout

Incorporating data in real time increases accuracy and productivity of field personnel.

RTS and other digital layout equipment help reduce the time and increase the accuracy of field layout.

在施工期間,布置點真實的time for each of the building components for concrete, steel, utilities, interior walls, ceilings, etc., can be tedious and time-consuming. Leveraging the 3D geometry and data in the BIM model, Robotic Total Station (RTS) equipment and other digital layout technology can significantly reduce the time needed to locate and construct work via 3D model geo-referenced coordinate system to immediately locate, stake-out, and execute in the field without additional survey. Additionally, Haskell is able to provide round-trip as-built data back to engineers in the office, to understand exact anchor bolt locations, underground utility locations, piping penetrations, and any other critical information, to make design adjustments as necessary, thereby increasing project productivity and expediting schedule.

Director – Virtual Construction

Related Projects

Andrews Air Force Base, Maryland
Cape Cod, Buzzards Bay, Massachusetts

欧宝体育投注下载

Bush's Best Colored Logo
Bently Heritage Colored Logo
United States Coast Guard Colored Logo
U.S. Air Force Colored Logo
Jacksonville University JU Colored Logo
Clarifier tank and process piping

The planning and coordination of the construction interface between the new WWTP and our operating production facility have been very effective. The BC-Haskell team operates in an open and collaborative environment. Design or field construction challenges are addressed in a direct and objective manner with all parties focused on a common goal of successful project delivery and start-up."

Terry Farris
Director of Engineering, Bush Brothers & Company
View from above the exterior storage tanks

The planning and coordination of the construction interface between the new WWTP and our operating production facility have been very effective. The BC-Haskell team operates in an open and collaborative environment. Design or field construction challenges are addressed in a direct and objective manner with all parties focused on a common goal of successful project delivery and start-up."

Terry Farris
Director of Engineering, Bush Brothers & Company

Related News & Insights

These days, Sonny Carter is an experienced and accomplished project superintendent with Haskell, responsible for planning...

What happens when you attempt an infrastructure improvement project without full plans and specifications? For progressive...

As a pioneer in design-build delivery, Haskell always has worked across the architectural, engineering and construction...

For Emily Moseley, engineering isn’t only a job. Inspired by a former teacher and mentor, Moseley discovered her interest...

Subscribe to News & Insights

Haskell celebrates #WomenInConstructionWeek this year by posing career- and industry-related questions to a group of women instrumental in leading the delivery of our clients’ multimillion-dollar projects. #WomenInConstruction #InternationalWomensDay
//www.hayalbahis142.com/insights/women-in-construction-week-challenges-industry-to-envision-equity/

© 2022 Haskell. All rights reserved.

Baidu
map